Tikfollowers

Charlotte water standard details. pdf Contact John Keene, Senior Project Manager.

com. 20. S. Charlotte, NC 28216. These Standard Specifications represent the minimum requirements Section 08. 01 Design of Water Mains Section 09. bwilliams. Fourth Street, Charlotte, NC 28202. Charlotte Water and its contractors will be hosting a public meeting (PDF, 249KB) for residents and businesses to learn more about construction work for wastewater system improvements in the area. C:0111101111 FINALSAA PRECAST CONC MB FOR 3 4IN DOMESTIC WATER SERVICE Model (1) Author. 48 to 72 Inch Median Excavation, Drainage and Backfill Root Flare Depths (Tree Rootball Condition on Trees from Suppliers) Reinforced Concrete Sidewalk (Bridging Tree 34. Created Date. NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ: 24: 2000B (PDF, 122KB) NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ: 24: 2000C (PDF, 112KB) NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ: 24: 2003 (PDF, 70KB) Double Brick Catch Basin: 20: 2005A (PDF, 76KB Post-Construction Stormwater Ordinances (PCSOs) of the City of Charlotte, Mecklenburg County and the six towns protect streams and lakes from water quality and water quantity problems generated by land development and impervious surfaces. zip file and select "save as" to download each to your computer. All construction shall conform to either Charlotte County Utilities Section 001570 - Erosion and Sediment Control Effective Date: Nov. 12. Charlotte-Mecklenburg Storm Water Services is currently in the process of revising the BMP Design Manual. Details & Consultant Resources. gov or 980. Charlotte-Mecklenburg Storm Water Services. 4. Jun 27, 2024 · Water line construction can only be performed by a North Carolina licensed contractor. Almost 15,000 water samples are collected per year and over 20 different parameters are routinely screened; Automated samplers at 35 locations measure five parameters per hour, 24 hours a day. Important considerations. 4" 2" 4" 6" 6" 10" collar, typ. 1546. Contact Charlotte Water (CLT Water) at 704-336-2456 for an inspection. Charlotte County Utilities Section 002540 – Submersible Sewage Pump Lift Station - Standard Design Effective Date: Nov. All 6" and larger sewer services require New Service site plan review. K-2 3-4ths and 1 inch Domestic Water Service Connection - Part Two. 2633 (CODE) or visiting their website, www. 704. The following specifications and special provisions are intended to be used in conjunction with Charlotte Land Development Standard Drawings, NCDOT Roadway Standard Drawings, and NCDOT Standard Specifications for Roads and Structures for all development within the City of Charlotte and the City of Charlotte ETJ unless otherwise Residential Alley Detail Single Loaded with Two-Way Operation. The city improves the public storm drainage system and addresses surface water quality needs of unnamed tributaries draining less than one square mile. We maintain over 4,000 miles of water mains in our system’s Need to start or stop water service? Contact Charlotte Water by dialing 311 or 704-336-7600 and ask for "water move in or move out" between 7:00 a. dwg files of the CLDSM standard details. Water Access: The contractor shall be responsible for obtaining water access necessary for performance of work under the contract from designated fire hydrants at the site of work or Wastewater. Free essays, homework help, flashcards, research papers, book reports, term papers, history, science, politics Erosion and Sediment Control. M. As part of this process, a draft version of the Stormwater Control Measure (SCM) Design Manual can be viewed here. 1 . Well Construction Permitting Fees ». 2 CHARLOTTE STREETS MAP. Sign up to get updates on SPs, details and CAD standards. Changes will include updated language for clarity, updated graphics, new and updated definitions, adjustments to use permissions and prescribed conditions, revised use names, and minor changes to additions and standards. 00b 5 special requirements and notes sheet title dwg concrete junction box (with optional manhole) 12" thru 66" pipe note 1; optional manhole is required 840. (Continued) Charlotte Water - Backflow Prevention Plan Review c/o LUESA Code Enforcement, 700 N. For a PDF copy of the complete manual, see the "Related Resources" section to the right side of this page. , Charlotte, NC 28202. 13. Plastic meter box for 5/8” and 1” water meters . Plats can also be mailed to the CMGC, Attn: CLT Development Center, Lobby Level Water systems wishing to submit standard specifications for review can receive more information by emailing the Public Water Supply Section Plan Review Unit at pwssection. All engineers and contractors will be expected to use these Standard Specifications during the design, bidding and construction process to ensure uniformity in standards, materials, products, and construction. 1024C (PDF, 114KB) Commercial and residential drop curb driveway with sidewalk abutting curb. m. zip files below are archive files containing AutoCAD . Potable Water All Files from The extension of any needed rights-of-way or easements for the water or sewer system operated by the Charlotte Water. Proposal. N. This report is a snapshot of last year’s water quality. W. Fire hydrant installation strip pavement with ditch . Opening or downloading Microsoft Word, Excel or PowerPoint documents. rev. Standard Detail # 3 (dwg file (DWG, 703KB) or pdf (PDF, 232KB)) All proposals require review and approval by Charlotte Water. 1 DRAINAGE. a. Newsroom. dwg 20. pa. Plats will continue to be dropped off and picked up in the basement of the CMGC. The practice standards and specifications are guidelines, intended to minimize the time required to Landscape, Screening, & Tree Preservation: 20. Standard Detail Documents. PDF FileTitleEffective Revision1102Local Residential Typical Ditch Type Street Section231107AResidential Collector Street Charlotte Water will fund 50% of the cost of eligible extensions when one or more customers provide the other 50%. description: 1. 8" mechanical joint outlet tee, 8" foster adaptor and 8" mj gate valve on new main. 4. The Charlotte Streets Map (Streets Map) shows the location of existing and planned future arterial and collector streets, and any shared-use paths located along local Dec 9, 2022 · Charlotte Harbor. Bob Briggs 704-336-2997, Jamie Hyde 704-432-6008, Michael Rice 704-432-2794, Margaret Crowell 704-432-5163 Fax: 704-632-8363. 00B NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ 20. 1025A (PDF, 82KB) Residential drop curb type I driveway with planting strip (2'-6" curb and gutter) 24. Adhere to safety standards and wear personal protective equipment. ASTM D 2239 Standard Specification for Polyethylene (PE) Plastic Pipe 34. 1st, 2011 Page 4 of 12 soil erosion, control sediment from construction activities, and protect receiving waters and storm water conveyance systems. 2. (941) 625-2288. Many water systems owned by units of local government have standard specifications for water main extensions. All storm drainage design shall conform to the standards and specifications as provided in the Charlotte-Mecklenburg Storm Water Design Manual, North Carolina Department of Transportation Standards Specifications for Roads and Structures, Mecklenburg County Land. View our strategic plan Sustainable Stormwater Management Strategy for a Thriving City (PDF, 19MB) to Explore the 2022 Urban Tree Canopy Assessment. The following details are provided as boilerplates only and must be revised and modified to meet the specific needs of each specific project. no. For Google Chrome and Microsoft Edge users: The document will automatically download to charlotte watera city of charlotte departmentstandard details c h a l o t t e t e r w r no scale water version 1. Charlotte Land Development Standards Manual (CLDSM) B. Say goodbye to paper bills and hello to convenience and less clutter! Charlotte Water, Water and Sewer Design and Construction Standards; CATS Bus Stops – Special Details; Other city code, state, or federal regulations; 33. 2' vertical drop through each manhole. No drop is required through manholes for sewers 18" in diameter and larger. 00C. gov . SACRAMENTO OFFICE 910 K Street, Suite 300 | Sacramento, CA 95814. Please provide: Social Security Number (SSN) (preferred); or. Note: these forms are in Adobe® Acrobat® PDF format and may be viewed using the free Adobe® Acrobat 1,846 Followers, 252 Following, 903 Posts - Charlotte Water (@cltwater) on Instagram: "Official feed for Charlotte Water, Water & Sewer provider for City of Charlotte, NC; call 311 for emergencies; Not monitored 24/7" Manual air releases shall be provided at high points on all 12-inch and larger water mains. City Code Appendix A (Zoning) - S. 2000 Storm Drain Standards. 17. Dec 1, 2022 · Updated Technology Reveals Details of Water Usage. This project will take about seven years to completely roll out to all Charlotte residents The use of Standard Details is mandatory in all Uisce Éireann Connection Agreement Offers issued after 6 June 2016. Zero. EWG's Tap Water Database chemical contaminant results for Charlotte County Utilities. Consistently respond appropriately and professionally to questions or concerns with other employees and city customers. 19. slope top of concrete base 2" toward trough 6" 10" 4" 3" 3" concrete collar section of precast manhole 6" notes: 1. 32 brick junction CHARLOTTE WATER [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised May 12, 2016 2. The . Title. USDGseriesDWG (ZIP, 9MB) Standards for urban street design. Work outside 90% of the time. 18. Water. Please contact Jordan Miller with any questions at Jordan. Fire hydrant installation roll curb and gutter . 02 Water Main Materials Section 09. • Current Charlotte Tree Ordinance – applicable June 1, 2023. Stormwater Design Manual - Charlotte-Mecklenburg Storm Water Design Manual (CMSWDM) Charlotte Water Design Manual - Water and Sewer design manual. 8/26/2011 3:18:42 PM. Concrete Water Meter Box for 3/4-inch Water Meter. sing zone unless otherwise provided by residential driveways, intersecting sidewalk, etc. During the presentation, project representatives will share more details about the wastewater system capacity needs, current construction activities No more waiting for the mail. AA. Sidewalk widths shall be a minimum of five (5) feet unless otherwise specified. org. pdf. C:BJW workingDetails For SpecWaterLL Dead End Blocking 14-30 Model (1) Author. Section 09. 3829. com: City Code Appendix A - Zoning. , Monday through Friday. The installation of drainage improvements through one or more lots to serve one or more other lots. keene@charlottenc. 1 TECHNICAL STANDARDS Construction and technical details for streets, including in-street drainage and water and sewer utilities, off-street public paths, and cross-access are available in one or more of the following: A. Utility Details. gov. 5000seriesDWG (ZIP, 3MB) Miscellaneous standards. Miller@charlottenc. The City of Charlotte Ordinance #3077 is an ordinance creating a new Article V to Chapter 23 of the Charlotte City Code, entitled "Backflow Prevention and Cross Connection Control". 336. c. 1_08302011. Engineers and consultants are required to seal all details used on each City of Charlotte project. Stanford@charlottenc. 02 Streets 03 Erosion and Sedimentation Control 04 Storm Drainage 06 Landscaping 07 Miscellaneous. 5001A (PDF, 54KB) Precast Concrete Pavers for Uptown Streetscape. Effective Revision. Charlotte Harbor Water Association Main Office 2515 Highlands Road Punta Gorda , FL 33983 City of Charlotte e grade. 1120 (PDF, 66KB) Residential Alley Hammerheads and Intersections. § 60A-307. The links will open the most up-to-date versions of the ordinances at Municode. Construction duration: 24+ months. The following are guidelines and requirements for delivery and acceptance for electric plan submittals. Included are details about your source(s) of water, what it contains, and how it compares to standards set by regulatory agencies. 0 . 3/4” or 1” water connection for 5/8” and 1” water You Are Here : Home / Growth and Development / CLT Development Center / Land Development Standards Manual (CLDSM) /5000 Series. 00A NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ 20. Please send fees to: City of Charlotte, CLT Development Center – Lobby Level, 600 E. 1025B (PDF, 77KB) Commercial drop curb type II driveway with planting strip (2'-6" curb and gutter) 0 cross reference - index of water standard details v1. HARP Manual (PDF, 13MB) - Selection and Planting Guide for Aquatic and Wetland Plants in the Piedmont Region of North Carolina. planreview@deq. nc. 1, 2011 (Rev#01) Page 3 of 34 h. By enrolling in eBilling, you’ll conveniently receive an email each month when your bill is ready for viewing online. The Standard Specifications have been designed into a bid-ready format. The following documents represent the most updated list of Standard Details and Technical Specifications for North City Water District: Appendix 4A – Technical Specifications. 00C NCDOT Standards Approved For Use in the City of Charlotte and Charlotte ETJ 20. Standard Drawing Details: The Standard Drawing Details have been updated with clarifications that have been discovered from the previous publication. xlsx Page 1 of 2 8/30/2011 Old 40. Appendix 4B – Standard Details. ” These standards and drawings are required for all plans. Page 5 of 7 Response: These sewers will use the Charlotte Water standard details from Chapter 15 -Sanitary Sewer Main Specs and Standards dated July 27, 1995 Revize Below is a list of various City of Charlotte Code sections and ordinances that apply to land development in the City and ETJ. We maintain over 4,000 miles of water mains in our system Sep 24, 2010 · Standard tapping sleeve and valve . Charlotte Water must inspect the backflow prevention device assembly. 0 date 8/2021 detail ggg no. 23. 00Adwg 20. and 7:00 p. An initial passing test must be completed and submitted by an Approved Charlotte Water Backflow Tester within ten business days of the water Charlotte Water wants to hear from customers about their experience with the water system. The ultimate aim of the ordinances is to assure that when land is divided, each resulting lot will be provided with minimum services such as public streets, sewer and water systems, and storm drains. 7600. Where development abuts a street controlled by the North Carolina Department of Transportation (NCDOT), all requirements and standards in these Subdivision, Streets, and Infrastructure Articles apply, unless otherwise Sep 9, 2020 · Charlotte Water Water System Number: 01-60-010 We are pleased to present to you this year's Annual Drinking Water Quality Report. Read the disclaimer (DOCX, 25KB) for Storm Water generic details. The UDO combined eight development ordinances, including the zoning ordinance, into one set of regulations to make them clearer and easier to use. W-2. New for 2011, Section 5. Org Chart (PDF, 997KB) University of North Carolina at Charlotte Show location of all existing and proposed CLTWater-required backflow preventers. 00A. Back to top. 603 of the City Zoning Ordinance, the City Engineer shall review the drainage plan for compliance with the standards contained in the current edition of the Charlotte Land Development Standards Manual and the Charlotte-Mecklenburg Storm Water Design Manual and all other relevant and appropriate standards Capital Improvement Plan. 980. Punta Gorda FL 33983. Pause. Each year, a wide range of surface water quality monitoring data is collected from streams and lakes throughout the City of Charlotte and Mecklenburg County. Also, air releases shall be provided at high points on 6-inch and 8-inch water mains where air cannot be adequately released from the main through service connections. Charlotte Storm Water Services is located at the One Water Facility, 4100 West Tyvola Road. jbatts. standard valve box assembly city of charlotte land development standards includes charlotte etj ncdot standards approved for use in the city of charlotte and charlotte etj std. 40. The Codes of Practice will be mandatory in all Connection Agreements issued from 30th April 2017. The Charlotte-Mecklenburg Storm Water Design Manual provides technical and engineering procedures to assist in the design and evaluation of stormwater management facilities in the City of Charlotte and Mecklenburg County. At a later date, Charlotte Water will provide more details regarding when projects will be required to comply with the new Design Manual. Once construction begins, construction inspectors will periodically inspect the water line to ensure that the line and its appurtenances are being constructed as designed and as to the Standard Details and Specifications. 2 . Contact Us. Your water regularly meets and exceeds all state and federal drinking water standards. A $150 fee will be charged for review. Follow Us on Social Media. As construction nears completion, the Charlotte- Land Development Standards Manual means the manual of construction standard drawings and details prepared by the city engineer, which provides standard designs for public and private improvements relating to streets, sidewalks, drainage and other facilities. 3000seriesDWG (ZIP, 7MB) Erosion control standards. 73 to 120 Inch Median Excavation, Drainage and Backfill. Call: 311 or 704. Text Amendment to allow minor changes that will result in better functionality of the UDO. The consultant (s) shall inform the city project manager once they are prepared to upload To get certified, please click the tab above titled “Certification”. Standard Details for water infrastructure; Design Risk Assessment for water infrastructure standard details It is then pumped through more than 4,200 miles of water pipes directly to your home. Water Association. In the latest move to modernize Charlotte’s infrastructure, Charlotte Water will be updating your water meters with a newer, advanced water meter reading system. Landscape Construction Standards (PDF, 673KB) - Landscape Management C:BJW workingDetails For SpecWaterLL Dead End Blocking 14-30 Model (1) Title. Where necessary, a 5’ x 5’ sidewalk is required at least every 200’ as required by PROWAG for a. Below is the current effective Charlotte Land Development Standards Manual by section and chapter. 5001B (PDF, 88KB) 5 days ago · The standard detail drawings below apply to all Site Permit Review (formerly Concurrent Review). C. The Charlotte Planning Design and Development shapes, connects, and designs great places to preserve our built and natural spaces, plan for growth, and guide development of our thriving communities. The Charlotte Unified Development Ordinance (UDO) is now in effect. Charlotte-Mecklenburg Storm Water Services is a joint municipal/county stormwater utility that includes the City of Charlotte, the surrounding towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill and Pineville and Mecklenburg County. 24. dwg std det99Sdw29 Model (1) Author: jbatts Created Date: 8/13/2009 6:48:22 PM These Standard Specifications represent the minimum requirements; additional specifications or requirements may be added to projects on an as-needed basis. Normal work hours: 8:00 a. Adequate storm drainage shall be provided, in the public interest, to allow the proper regulation and disposal of surface water runoff. 13 – 20. W-3. manholes shall also comply with standard If you have any questions or require assistance regarding Well Construction Permitting or Well Contractor Licensing, please contact us at wells@sfwmd. 75-inch Domestic Water Service. The Engineering Division of Public Works is responsible for the management and implementation of those capital improvement projects necessary to maintain and expand our water and waste water utility system to meet the current and future needs of our customers. gov or (561) 682-6930. This manual contains tools and information for developing plans to minimize soil erosion and prevent sedimentation associated with land-disturbing activities. December 1, 2022 Amber Nielsen. ASTM D 698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)) 3. 2086. 18. 00 Water Main Construction Details. 5000 Series. Storm drainage shall be constructed in accordance with the Charlotte-Mecklenburg Storm Water Services Design Manual, the Charlotte Land Development Standards Manual (CLDSM), and Article 24. the public potable water from backflow of dangerous substances which would endanger the public health or physically damage the public water system. 748. 2515 Highlands Road. Service Connection Site Plans: All 1. Payments are processed within one business day after receipt. New Subdivision Streets: The water main shall be laid and maintained to the required lines and grades with fittings, valves and hydrants at the required locations; spigots centered in bells; and all valves and hydrant stems plumb. It provides engineering design guidance to: local agencies responsible for implementing the Charlotte-Mecklenburg Storm Land Development Projects (Donated Projects): Plans shall be submitted through the City of Charlotte Land Development Accela electronic portal. Storm drainage shall be installed constructed in accordance with the Charlotte-Mecklenburg Storm Water Design Manual, the Charlotte Land Development Standards Manual (CLDSM), and Article 24. Monday through Friday. $ 100. Each year, Charlotte Water performs more than 150,000 tests to ensure the safety and quality of our drinking water. 262. Development Standards Manual, or the more restrictive of any standards that conflict. View on Map . Our eBill is a secure way to receive and view your bill online. Any unplanned water outages are considered emergencies and will be repaired as soon as possible. 8/24/2011 10:38:50 AM. Where the grade is critical, or where the grade exceeds 5%, this drop can be reduced. 3/4 and 1-inch Water Service Connection. john. About Us. Charlotte Water is the municipal water and sewer services provider for Charlotte, NC and surrounding region. Erosion and Sediment Control Planning and Design Manual. Manual air releases shall be according to current standard details. Make your life easier by receiving your bill each month online. 1121 (PDF, 62KB) Oversized Residential Cul-de-sacs with Raised Planter Island. 00 Roadways/Storm Drainage Details. Well Contractor License Application/Exam Fee (effective Sept. 14 6’ Tree Planting Strip UMUD Only Median Greater than 120 Inches Excavation, Drainage and Backfill. 3. 8" outlet tapping sleeve and 8" fl x mj tapping valve on existing main. HEADQUARTERS 1250 I Street NW, Suite 1000 | Washington, DC 20005 | (202) 667-6982. Call the Mecklenburg County Code Enforcement at 704. C. Customers will be notified of planned water outages at least 72-hours in advance. Employer Tax Identification Number (EIN) Note: (this is a business tax identification number, NOT Title: C:STD DET WATER 2009 FINALS6 5 2009 Files named @. G. Charlotte Water is looking forward to posting a final, NCDEQ approved document for viewing in 3rd Quarter 2023. They are intended to be used as a guide in the preparation and submittal of plans for private development and city contract projects within the City of Raleigh and the city's extra-territorial jurisdiction. 03 Construction, Installation and Testing of Water Mains Section 10. If you have questions, please contact Daniel Stanford, Charlotte Storm Water Services, Erosion Control Coordinator, at Daniel. 5100 Brookshire Boulevard. Right click on each . I. 5. The installation of a private wastewater treatment plant or a private water supply system for more than one lot or According to state law (House Bill H2499 and HB 1766), all irrigation systems installed after July 1, 2009 must be connected to a separate irrigation meter, unless platted prior to July 1, 2009. Well Construction Permit. • Urban Forestry Standard Notes – Commercial/Subdivision (PDF, 168KB) • Urban Forestry Standard Notes - Residential (PDF, 130KB) • Charlotte Land Development Standards Manual – 4000 Series Trees. Charlotte, North Carolina; Serves: 1,093,901 Data available: 2013-2019 * Source: Surface water * 2013 testing is for chemicals in EPA's Third Unregulated Contaminant Monitoring Rule (UCMR-3) only. In accordance with Section 12. Tryon St. For sewers 15-inches in diameter and smaller, allow a 0. AA Precast Concrete Meter Box - Use with 0. Consider this example that demonstrates the impacts of land development and new impervious surfaces: one The consultant shall perform all CAD-related services in accordance with the City of Charlotte General Services CAD standards. Generally the ordinances specify: Charlotte County Utilities has outlined its “Standard Drawing Details. Previous. Ability to learn and follow instructions as well as safely and effectively use power tools and small equipment. – 5:00 p. 1 shall be determined on a case-by-case basis by the Charlotte Department of Transportation (CDOT). 00B. Fire hydrant installation standard curb and gutter . Charlotte-Mecklenburg Storm Water Design Manual . • Approved Apr 12, 2024 · Water pressure is primarily due to the elevation of storage tanks relative to the elevation of your home. City Code Purchasing Information: The Code of Ordinances book can be purchased by contacting Municipal Code Corporation at 800. pdf Contact John Keene, Senior Project Manager. 500' 550' 700' 800'. Charlotte Water is the largest public water and wastewater utility in the Carolinas, serving more than a million customers in the City of Charlotte and greater Mecklenburg County -- including the towns of Matthews, Mint Hill, Pineville, Huntersville, Davidson, and Cornelius. This program may be combined with the Residential Street Main Extension Program for customers who require extensions greater than 1,000 feet, and less than 2,000 in length. 26, 2012) Meter Selection Guidelines – 9/12/2023 120 Unit Complex with 40 1-Bath, 40 2-Bath and 40 3-Bath 1 Bath Units (40) 2 Bath Units (40) 8" - 12" 15" - 27" 30" - 42" Over 42". Hidden Valley neighborhood: Spring 2022. 5" and larger water services and manifold assemblies require New Service site plan review. Construction and technical details for streets, including in-street drainage and water and sewer utilities, off-street public paths, and cross-access are available in one or more of the following: Charlotte Land Development Standards Manual (CLDSM) 34. The adoption of the UDO was a city-wide effort to update the regulations that guide growth and development in Charlotte. municode. These ordinances specify certain minimum requirements and standards that all land divisions must include. Stream Buffer Ordinance (PDF, 1MB) For information about licensing EWG data and analyses, contact permissionrequests [at]ewg. 13. 293. Whenever charlotte-mecklenburg standard detail sewer 8 khp varies a precast manholes installed over existing pipe b b section b-b section a-a r is e r 12" min. All storm water prevention activities shall ensure that the 29 NTU turbidity or current requirement is met. PDF File. tk ym fd wa cv jn ab xd to no